The Maricopa County Department of Transportation (MCDOT) will be milling and overlaying Old US 80 in preparation of placing a High Friction Surface Treatment (HFST) in the area of Old US 80, from Patterson Road to Agua Caliente Extension Road.

The project length is approximately 1.5 miles along Old US 80. All work will be done within MCDOT right of way.

 For more information, please email [email protected] or call 602-506-3342.

Schedule is subject to change for reasons beyond MCDOT’s control, including weather, equipment failure, illness or other circumstances.

For information about Title VI, please visit our information page.

Project Mini Map
Project Map (Aerial)

Project Info

Scoping Schedule:

Design Schedule:

Construction Schedule:

Project Phase

Current Phase: