Project Description

MCDOT is constructing an all-weather crossing over Tiger Wash to allow for continuous uninterrupted travel in the area.

The work consists of realigning Eagle Eye Road and constructing a new bridge crossing at Tiger Wash including existing pavement removal, roadway excavation, embankment construction, drainage channel excavation, soil cement bank protection construction, grading, furnishing and placing aggregate base, asphaltic concrete pavement, signing, pavement marking, and other miscellaneous work items.


For information about Title VI, please visit our information page.

Project Mini Map
Project Map (Aerial)

Project Info

Scoping Schedule:

Design Schedule:

Construction Schedule:

Project Phase

Current Phase: