Skip to main content

Gilbert Road Bridge at Salt River

Project #: TT0339

Project Description

The Maricopa County Department of Transportation, in cooperation with the Salt River Pima-Maricopa Indian Community (SRPMIC) and the City of Mesa, is constructing a new bridge over the Salt River.

The new four-lane Gilbert Road Bridge will replace the existing two-lane bridge and low water crossing, which can become flooded during high water flows in the Salt River. Located on Gilbert Road between Thomas Road and State Route 87 (Beeline Highway), the bridge will be built in phases and provide two northbound and two southbound lanes. The project includes new pavement, signage and improved drainage in the project area.

For more information, visit: https://www.maricopa.gov/5894/Gilbert-Road-Bridge-at-Salt-River

For information about Title VI, please visit our information page.

Project Mini Map
Project Map (Aerial)

Project Info

Scoping Schedule: 2015-2016

Design Schedule: 2012-2022

Construction Schedule: 2022-2025

Project Phase

Current Phase: Construction

Subscribe to our newsletter