Black Canyon Hwy/ Fort McDowell Road/ San Tan Blvd Pavement Preservation
Project #: MP2501
Project Description
The Maricopa County Department of Transportation (MCDOT) willy apply a preservative seal to roads in the Anthem/New River, Fort McDowell Yavapai Nation, and Chandler Heights area.
The project will include:
- Applying preservative seal to existing asphalt concrete pavement.
- Striping work within 72 hours of preservative seal.
- Installing pavement markings.
- Other miscellaneous work and cleanup.
The pavement preservation project will help extend the life of the roadway, renew the surface, seal small cracks, and protect the road from UV rays. One lane will be open to traffic with a pilot car to lead drivers through the construction zone. Access to properties will be maintained during construction, however there may be a delay while equipment passes driveways and roads. Crews will provide access to driveways and roads as quickly as possible. Please watch for work crews, obey all traffic control signs and slow down in the work zone.
Where:
Black Canyon Highway between West Plymouth Drive and West Circle Mountain Road; Black Canyon Highway between West Tunnel Mine Road and New River Road; New River Road from Black Canyon Highway to East Desert Hills Road.
Fort McDowell Road between Fort Loop Road and State Route 87; East Mohave Road; East Yavapai Road.
East San Tan Boulevard between 170th Street and Ellsworth Road; Hunt Highway between Stacey Road and Power Road; Hawes Road between Riggs Road and Hunt Highway.