Verrado Way Bridge at Buckeye Canal

Project #: MB2601

Project Description

In order to enhance and extend the life of the roadway, the Maricopa County Department of Transportation (MCDOT) is conducting preventive maintenance on the Verrado Way bridge over the Buckeye Canal, in the unincorporated area of Liberty, east of Buckeye. Due to the construction involved, a full closure of the bridge and the roadway within the project limits is required. This bridge work and full closure of Verrado Way at the canal begins on Wednesday, January 28, 2026, at 7 a.m. and is expected to last until the end of March. Detour signage will be in place to provide for alternate travel in the area using Broadway Road, Dean Road and MC85. Local traffic can continue to use Verrado Way outside of the project limits.

The project includes:

  • Removing the bridge deck surface and replacing it with a new concrete surface.
  • Adding an epoxy overlay to the concrete approach slabs.
  • Applying new asphaltic concrete pavement.
  • Cleaning up the work zone and other finishing work.

Work Schedule:

Where: Verrado Way at Buckeye Canal

When: Wednesday, January 28, 2026, through the end of March 2026.

Monday through Friday from 7 a.m. to 5 p.m.

The closure is in place during all hours throughout the duration of the project.

No weekend or holiday work is anticipated.


For more information, please see the attached flyer.    

Questions: call the Project Hotline at 602-506-3342, or

email [email protected]    

MCDOT Project Number: MB2601 


For information about Title VI, please visit our information page.

Project Mini Map
Project Map (Aerial)

Project Info

Scoping Schedule:

Design Schedule:

Construction Schedule: 2/26-4/26

Project Phase

Current Phase: Construction