Lake Pleasant Access Road Erosion Repair
Project #: MB2105
Project Description
Erosion around the concrete culvert on Lake Pleasant Access Road requires attention.
The goal of the project is to backfill the eroded areas and armor with rip rap. Doing so will help ensure the water will drain properly and prevent scouring.
Construction is slated to begin in spring of 2026.
For more information, please email [email protected] or call 602-506-3342.
Schedule is subject to change for reasons beyond MCDOT’s control, including weather, equipment failure, illness or other circumstances.
For information about Title VI, please visit our information page.
Project Info
Scoping Schedule: 2021
Design Schedule: 2025
Construction Schedule: 2026
Project Phase
Current Phase: Design