Lake Pleasant Access Road Erosion Repair

Project #: MB2105

Project Description

Erosion around the concrete culvert on Lake Pleasant Access Road requires attention.

The goal of the project is to backfill the eroded areas and armor with rip rap. Doing so will help ensure the water will drain properly and prevent scouring.

Construction is slated to begin in spring of 2026.

For more information, please email [email protected] or call 602-506-3342.

Schedule is subject to change for reasons beyond MCDOT’s control, including weather, equipment failure, illness or other circumstances.

For information about Title VI, please visit our information page.

Project Mini Map
Project Map (Aerial)

Project Info

Scoping Schedule: 2021

Design Schedule: 2025

Construction Schedule: 2026

Project Phase

Current Phase: Design